Technical Parameters 1. Input power: two-phase three-wire 220V ± 10% 50Hz 2. Working environment: temperature -10 °C ~ +55 °C Relative humidity ≤ 95% (no condensation) altitude <2000m 3. Device capacity: ≤2.5kVA 4. Overall structure size: width 1200mm × depth 700mm × height 800mm 5.Security protection: with leakage protection, safety in line with national standards
Equipment overview
• The unit demonstrates the practical application of such a combined system for student to conduct the investigation of wind power generation.
• Three phase AC permanent magnet generator is used for the wind power generation, which is driven by a DC gear motor to simulate the wind turbine working under different wind speed. By this way to achieve system performance inside the laboratory irrespective of outside conditions.
• Maximum power point tracking type wind controller is adopted for the high efficiency power generation control. Multifunctional meter is adopted for system voltage / current monitoring, with LCD screen.
• Dedicated instrumentation includes, AC/DC voltmeter and ampere meters for investigation of system efficiency and characteristics.
Training program
• Wind power generator simulated wind speed experiment
• Wind power generator output voltage experiment
• Wind controller braking experiment
• Wind power generator V/I output characteristic curve experiment
• Storage battery charging experiment
• Wind controller resistance load experiment
• DC resistive and inductive load experiment
• AC resistive and inductive load experiment
• Integrated load experiment
Contact: Gustavo Zhang
Phone: +86 18966252578
Tel: +86-577-67318236
Email: Gustavo@hengrytech.com
Add: Yongjia county, wenzhou city, zhejiang province ou the five-star industrial zone north street